Master Shower Completed

Back in May our Master shower went kaputs on us and so began the two month long construction project. Part of the reason it took that long was because of issues with the contractor and deciding on what type of shower door to go with.

This picture was from before we bought the house. We did not do anything to the shower itself, but we did take the wallpaper down and paint right away.

Here is the BEFORE picture:
Here are the AFTER pictures:


We ended up just going with a oil rubbed bronze framed door instead of a semi-framless door mostly because of the major difference in price. I was pleasantly surprised how much I actually liked the door, and Brian did a great job installing it all by himself!


Some things we did that was different than the previous shower (besides the obvious) was tile to ceiling, bring the shower out 4 inches, tiled the floor,




and put a built in soap box in.




At first we bought nickel fixtures, but last minute God provided a great deal on oil rubbed bronze fixtures. When we held up the fixtures side by side on the tile there was no question which ones to go with. I absolutely love the bronze look and how everything turned out!


Now, it is time to update the rest of the bathroom with bronze fixtures and get rid of the seashell sinks!